Click here to make tpub.com your Home Page

Page Title: Chapter 2. INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Items Comprising an Operable Equipment
Up
TM-11-6625-539-14-3 Test Set Transistor TS-1836 C/U Manual
Next
Figure 2­1. Typical packaging diagram.

TM 11-6625-539-14-3
INSTALLATION
2-1. Unpacking
b. Check to see that the equipment is com-
plete. The equipment is normally shipped less the
a. Packaging Data. When packed for shipment,
batteries. Report all discrepancies in accordance
Test Set, Transistor TS­1836C/U is placed in a
with TM 38­750. Shortage of a minor assembly
waterproof carton and packed in a wooden pack-
or part that does not affect proper functioning
ing case. A typical packing case and its contents
of the equipment should not prevent use of the
are shown in figure 2­1.
equipment.
b. Removing Contents (Wooden Packing Case),
c. If the equipment has been used or recondi-
Perform all the procedures in (1) through (5)
tioned, see whether it has been changed by a modi-
below when unpacking equipment packed in a
fication  work  order  (MWO),  If  the  equipment
wooden packing case (fig. 2­1 ).
has been modified, the MWO number will appear
(1) Cut and fold back the metal straps.
on the side near the nomenclature plate. Check
CAUTION
to see whether the MWO number (if any) and
D o not attempt to pry off the sides;
appropriate notations concerning the modifica-
this may damage the equipment.
tion have been entered in the equipment manual.
(2) Remove the nails from the cover and
NOTE
one side of the wooden packing case with a nail-
Current MWO's applicable to the equip-
puller. Remove the cover and one side.
ment are listed in DA Pam 310­7.
( 3 ) Open the moistureproof barrier that
covers the outer corrugated carton. Remove the
2-3. Cable Connections
carton.
¹(4) Open the outer corrugated carton and
No cable connections are necessary for operation
the moisture-vaporproof barrier within the carton.
of the test set other than the three accessory
Remove the inner corrugated carton.
test leads. Connect the three accessory test leads
(5) Open the inner corrugated carton, and
as follows:
remove the instrument.
a. Insert the red plug into the red jack.
2-2. Checking Unpacked Equipment
b. Insert the black plug into the black jack.
a. Inspect the equipment for damage incurred
c. Insert the yellow plug into the yellow jack.
during shipment.
--
--
.

Privacy Statement - Press Release - Copyright Information. - Contact Us