Click here to make tpub.com your Home Page

Page Title: Voltage and Resistance Tests
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Calibration Check Procedure
Up
TM-11-6625-524-15-1 Voltimeter Electronic AN/URM-145 Manual
Next
Table 1. Test Point Voltage

tubes, a replacement chopper should be tried.  If the new
chopper does not clear the difficulty, place the original
chopper back in socket.  The calibration accuracy must be
If the chopper is replaced, the drive coil
re-checked.
connections should be reversed (twisted pair from chopper
top cap to meter terminal board) to discover which
polarity gives lowest residual meter deflection (para. 3.2c)
The leads should then be resoldered in this polarity.
d.
Voltage and Resistance Tests
After determining that the trouble cannot be cured by re-
placement of tubes or chopper it is advisable to make a
systematic check of AC voltage, DC voltage, and resistance
at each socket pin.  Table I shows the nominal AC and DC
voltages to ground from each socket pin number.  Table 2
shows the nominal resistance values expected for each point.
Large or erratic deviations from the listed values of
voltage or resistance will serve as a clue in tracking
down a faulty component.  Once the trouble has been found
and corrected, the calibration must be re-checked and re-
adjusted as outlined in paragraph 5.3 and paragraph 5.5
e.
RF Probe Replacement:
Probes that have been damaged by overload or have become
inoperative or insensitive for any other reason should
be replaced rather than repaired. After replacement
calibration must be rechecked and adjusted if necessary.
The Probe serial number should agree with that of the
instrument; if exchanged, recalibration may be necessary.
5.5 Calibration Adjustment Procedure
Before making any calibration adjustments, it is essential
to provide the necessary reference standards as described
in paragraph 5.1 and take all precautions as outlined in
paragraph 5.2.  The calibration adjustment procedure shall
then be made as outlined in Table 3.
AN/URM-145
a

Privacy Statement - Press Release - Copyright Information. - Contact Us