Click here to make tpub.com your Home Page

Page Title: Section III. OPERATING PROCEDURE.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 4. METHOD FOR MAKING LOW INDUCTANCE CONNECTIONS TO TEST SIGNAL POINT DIRECTLY USING THE RF PROBE
Up
TM-11-6625-524-15-1 Voltimeter Electronic AN/URM-145 Manual
Next
Measurement Procedure

OPERATING PROCEDURE.
3.1
General Information
This section should be read carefully before using the
instrument.  It contains information necessary for
proper operation of the RF Voltmeter.
The power line frequency and voltage requirements of
the instrument are 105 to 125 Volts, 58 to 62 cycles.
It is important that it is plugged into its proper
power source.
3.2 Turn-on Procedure
a.  With the power cord plugged into an appropriate
AC source, turn the instrument on and allow a
warm-up period of approximately one minute.
b.
Connect the RF Probe cable to the "PROBE" re-
(Note: Check to
ceptacle on the front panel.
determine that the serial number of the probe
matches that of the instrument.  Each RF Volt-
meter is calibrated for its individual probe.
If probes should be interchanged without recali-
brating the instrument, errors in measurement may
result.)
c. Attach
Adapter to RF Probe in order to shield
the input from any stray RF fields (3.4c) before
preceding to adjust BALANCE control (3.2d).
AN/URM-145
a

Privacy Statement - Press Release - Copyright Information. - Contact Us