Click here to make tpub.com your Home Page

Page Title: CHAPTER 3. OPERATING INSTRUCTIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 2-4 Rack Mount Installation
Up
TM-11-6625-444-14-2 Voltmeter Digital AN/GSM-64C (NSN 6625-01-124-0834) (EIC: KNK) Manual
Next
Figure 3-1. Front Panel Controls and Instruments

TM 11-6625-444-14-2
OPERATING INSTRUCTIONS
Section I. CONTROLS AND INSTRUMENTS
plied to the HI and LO terminals on any voltage
3-1. General
range.  Potentials of 200 V peak may be applied
between the LO and GUARD terminals. Poten-
This section fully describes the controls and in-
tials of 300 V peak may be applied from GUARD
struments of the AN/GSM-64C Voltmeter. Figure
to case.
3 - 1 shows the location of each front panel
control and instrument while figure 3-2 shows
t h e location of the rear panel controls and
instruments Table 3-1 describes the function of
each front panel control and instrument while
table 3-2 lists the function of each rear panel
CAUTION
control and instrument.
Do not exceed the maximum poten-
tials between terminals that are
marked on the front and rear panels
3-2. Damage From Improper Settings
or damage to the equipment may
Voltages of up to 1000 Vdc or rms may be ap-
occur.

Privacy Statement - Press Release - Copyright Information. - Contact Us