Click here to make tpub.com your Home Page

Page Title: CHAPTER 2. OPERATING INSTRUCTIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 1-2. Front panel.
Up
TM-11-6625-444-14-1 Voltmeter Digital AN/GSM-64B (NSN 6625-00-022-7894) (EIC: KPF) Plug-In Electronic Test Equipment PL-1370/GSM-64B Manual
Next
Section II. INSTALLATION INSTRUCTIONS

TM 11-6625-444-14-1
OPERATING
INSTRUCTIONS
S e c t i o n 1 . SERVICE UPON RECEIPT OF M A T E R I A L
a.
Inspect the equipment for damage incurred
2-1. Unpacking
during  shipment.  If  the  equipment  has  been
When
packaged
for
a. P a c k a g i n g .
damaged, report the damage on SF 364 (Report of
s h ip me n t , the voltmeter is placed in a carton
Discrepancy (ROD)) as prescribed in AR 735-11-2.
and packed in a wood en box. A typical
b.
Check the equipment against the packing
packaging diagram and its contents are shown
slip to see if the shipment is complete. Report all
discrepancies in accordance with DA Pam 25-30.
b. Removing Contents.
The equipment should be placed in service even
(1) Cut and fold back metal straps.
though a minor assembly or part that does not
(2)  R e mo v e n a i ls f r o m t o p o f b o x a n d lift
affect proper functioning is missing.
o f f top.
c.
Check to see whether the equipment has
(3) Remove envelopes that contain
manuals and test leads.
b een modified. ( Equ ip men t wh ich ha s b een modified
(4) Remove packing around outer carton
will have the MWO number on the front panel, near
wrapped in waterproof bag.
the nomenclature plate.) Check also to see whether
(5) Remove outer carton from box and
a l l c u r r e n t a p p l i c a b l e MWO's h av e b e e n a p p l i e d .
open
( Cu r r en t MWO'S ap p l i ca b le to t h e e q u ip me n t a r e
moisture-vaporproof barrier and outer carton.
listed in DA Pam 25-30).
(6) Open the inner moisture-vapor proof
barrier and carton.
(7) Remove voltmeter from inner carton.
2-2. Checking Unpacked Equipment
Change 2

Privacy Statement - Press Release - Copyright Information. - Contact Us