Click here to make tpub.com your Home Page

Page Title: CHAPTER 2. SERVICE UPON RECEIPT AND INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 1-2. Ohmmeter ZM-21(*)/U, exterior view.
Up
TM-11-6625-298-14 Ohmmeter ZM-21/U ( NSN 5950-00-645-2191 ) Ohmmeter ZM-21A/U ( N S N 6625-00-643-1030) and Ohmmeter ZM-21B/U ( NSN 6625-00-581-2466) Manual
Next
Figure 2-1. Packaging of Ohmmeter ZM-21/U.

TM 11-6625-298-14
SERVICE UPON RECEIPT AND INSTALLATION
Section I. SERVICE UPON RECEIPT OF MATERIEL
2-1. Unpacking.
(5) Open the inner corrugated carton, and
remove the ohmmeter in its carrying case, the two
a. Refer to figure 2-1, and follow the steps below
test leads, and the technical publication.
when unpacking the ohmmeter.
(6) Open the carrying case, remove the ohm-
(1) Break and fold back the metal straps.
meter and desiccant bags and check the
(2) Remove the nails from the top of the
equipment , as specified in paragraph 2-2.
wooden packing crate with a nail-puller, and
b. The ohmmeter may be received as a domestic
remove the top. Do not attempt to pry off the
shipment, without a wooden crate. The unpacking
sides or top; such action may damage the
instructions given in a above apply also to un-
equipment.
packing domestic shipments. If heavy wrapping
(3) Remove the packaged equipment and cut
the tape that seals the carton.
paper has been used in lieu of cartons, remove it
carefully and check the contents as in paragraph 2-
(4) Cut the barrier material along the seam,
2.
and remove the inner corrugated carton.

Privacy Statement - Press Release - Copyright Information. - Contact Us