Click here to make tpub.com your Home Page

Page Title: ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND SERVICES-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND SERVICES
Up
TM-11-6625-291-14 Output Meters TS-585A/U TS-585B/U TS-585C/U (NSN6625-00-244-0501) TS-585D/U (NSN6625-00-684-5438) Manual
Next
Section IV TROUBLESHOOTING

TM 11-6625-291-14/TO 33A1-7-23-1
ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND SERVICES (CONT)
W - WEEKLY
INTERVAL
PROCEDURES
ITEM TO BE INSPECTED
ITEM
w
NO.
EXTERIOR SURFACES
2
Clean the exterior surfaces, including
the panel and meter glass. See chapter 3,
section Ill for cleaning procedures.
TEST LEADS
Check test leads for broken, cracked,
3
or frayed insulation.
Replace connectors that are broken or
worn.
BINDING POSTS
4
Check that test leads fit firmly into
binding posts to provide good contact.
Check handle and latches for looseness.
HANDLE AND
5
Replace or tighten as necessary
LATCHES
(Output Meters TS-585B/U, TS-585C/U
and TS-585D/U only).
--
6
IMPEDANCE CONTROL
Check that each knob moves freely
AND METER
and is not loose.
MULTIPLIER CONTROL
KNOBS
PANEL SCREWS
7
Tighten all panel screws.
METAL SURFACES
8
Check metal surfaces for rust and
corrosion. See chapter 3, section
Ill for touchup paint procedures.
MODIFICATION WORK
9
Check that all MWO'S are done.
ORDERS (MWO'S).
All URGENT MWO'S must be done at
once and all NORMAL MWO'S must be
scheduled.
4-5

Privacy Statement - Press Release - Copyright Information. - Contact Us