Click here to make tpub.com your Home Page

Page Title: METER NEEDLE ZERO ADJUSTMENT FOR TS-585A/U.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Schematic Drawing
Up
TM-11-6625-291-14 Output Meters TS-585A/U TS-585B/U TS-585C/U (NSN6625-00-244-0501) TS-585D/U (NSN6625-00-684-5438) Manual
Next
Schematic Drawing

TM 11-6625-291-14/TO 33A1-7-23-1
2-6. INITIAL ADJUSTMENTS.
The initial adjustments in this section are listed below.
Meter needle zero adjustment for TS-585AU
Meter needle zero adjustment for TS-585B/U, TS-585C/U, or TS-585D/U
2-7. METER NEEDLE ZERO ADJUSTMENT FOR TS-585A/U.
This task covers:
Adjustment
INITIAL SETUP
Tools
Personnel Required
TooI Kit, Electronic Equipment
One operator
TK-105/G
Materials/Parts
Equipment Condition
None
Output meter on workbench
ACTION
REMARKS
ITEM
LOCATION
ADJUSTMENT
NOTE
Look at meter needle from directly above. If meter needle Is not
directly above zero marking, perform the initial adjustment.
Using flat-tip screwdriver, turn screw left
Zero-set
Output Meter
or right to aline meter needle with zero
adjustment screw (1)
TS-585A/U
mark.
and meter needle (2)
2-12

Privacy Statement - Press Release - Copyright Information. - Contact Us