Click here to make tpub.com your Home Page

Page Title: UNPACKING PROCEDURE.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
ASSEMBLY AND PREPARATION FOR USE.
Up
TM-11-6625-291-14 Output Meters TS-585A/U TS-585B/U TS-585C/U (NSN6625-00-244-0501) TS-585D/U (NSN6625-00-684-5438) Manual
Next
Schematic Drawing

TM 11-6625-291-14/TO 33A1-7-23-1
2-5. UNPACKING PROCEDURE.
This task covers:
Unpacking
INITIAL SETUP
Personnel Required
Tools
Tool Kit, Electronic Equipment
One operator
TK-105/G
Materials/Parts
Equipment Condition
Output meter on workbench
None
ACTION
REMARKS
ITEM
LOCATION
REMOVAL
1 . Waterproof
Using pocket knife, cut seam along cover of
Cover flaps (1)
waterproof carton. Fold back cover flaps.
carton
Remove.
Waterproof
2.
Waterproof envelopes contain output
envelopes (2)
meter manuals.
Remove.
Corrugated tray (3)
3.
Remove.
4.
Inner carton (4)
Remove.
Output meter (5)
5.
NOTE
Check the basic issue items list is appendix C for all items
needed for the operation of the output meter.
2-10

Privacy Statement - Press Release - Copyright Information. - Contact Us