Click here to make tpub.com your Home Page

Page Title: SECTION I. INTRODUCTION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
ORGANIZATIONAL MAINTENANCE REPAIR PARTS AND SPECIAL TOOLS LISTS DECIBEL METERS ME-22/PCM AND ME-22A/PCM
Up
TM-11-6625-251-20P Decibel Meters ME-22/PCM and ME-22A/PCM FSN 6625-498-3469 Manual
Next
Maintenance code

TM 11-6625-251-20P
SECTION I
INTRODUCTION
1-1. Scope
This manual lists repair parts and special tools required for the performance of organizational maintenance of
the ME-22/PCM and ME-22A/PCM. The PCCN for the equipment is GTEAHU for all models.
1-2. General
This repair parts and special tools list is divided into the following sections:
a. Prescribed Load Allowance (PLA) Section II. Not applicable.
b. Repair Parts List-Section III. A list of repair parts authorized for the performance of maintenance at
the organizational level. This repair parts list is arranged in alphabetical order.
c. Special Tools, Test and Support Equipment-Section IV. Not applicable.
d. Index-Federal Stock Number and Reference Number Cross-Reference to Figure and Item Number
Section V. A list, in ascending numerical sequence, of all Federal stock numbers appearing in the listings,
followed by a list, in alphameric sequence, of all reference numbers appearing in the listings. Federal stock
number and reference numbers are cross-referenced to each illustration figure and item number or reference
designation appearance.
1-3. Explanation of Columns
The following provides an explanation of columns in the tabular lists-
a. Source, Maintenance, and Recoverability Codes (SMR).
(1) Source code. Indicates the manner of acquiring support items for maintenance, repair, or overhaul
of end items. Source codes are -
Code
Explanation
PA -  Item procured and stocked for anticipated or known usage.
PB -  Item procured and stocked for insurance purposes because essentially dictates that a minimum
quantity  be available in the supply systems.
PC -  Item procured and stocked and which otherwise could be coded PA except that it is deteriorative in
nature.
PD -
Support item, excluding support equipment, procured for initial issue or outfitting and stocked only for
subsequent or additional initial issues or outfittings. Not subject to automatic replenishment.
PE -
Support equipment procured and stocked for initial issue or outfitting to specified maintenance repair
activities.
PF -  Support equipment which will not be stocked but which will be centrally procured on demand.
PG -  Item procured and stocked to provide for sustained support for the life of the equipment. It is applied to
an item peculiar to the equipment which because of probable discontinuance or shutdown of production
facilities would prove uneconomical to reproduce at a later time.
KD -  An item of depot overhaul/repair kit and not purchased separately. Depot kit defined as a kit that
provides items required at the time of overhaul or repair.
KF -  An item of a maintenance kit and not purchased separately. Maintenance kit defined as a kit that
provides an item that can be replaced at organizational or direct support or general support levels of
maintenance.
KB -  Item included in both a depot overhaul/repair kit and a maintenance kit.
MO -  Item to be manufactured or fabricated at organizational level.
MF -  Item to be manufactured or fabricated at direct support maintenance level.
MH -  Item to be manufactured or fabricated at general support maintenance level.
MD -  Item to be manufactured or fabricated at depot maintenance level.
AO -  Item to be assembled at organizational level.
AF -  Item to be assembled at direct support maintenance level.
AH -  Item to be assembled at general support maintenance level.
AD -  Item to be assembled at depot maintenance level.
XA-Item is not procured or stocked because the requirements for the Item will result in the replacement of the
next higher assembly.
2

Privacy Statement - Press Release - Copyright Information. - Contact Us