Click here to make tpub.com your Home Page

Page Title: Final Procedure
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Resistance
Up
TB-9-4920-451-35 Fuel Quantity Gage Test Set Simmons Precision Inc. Model 472090-002 Gull Airborne Instruments Model GTF-4 Manual
Next
Figure 3. Consolidated Airborne Systems, Models TF20-1 and TF579 - adjustment locations.

TB 9-4920-451-35
b. Adjustments
(1) Adjust R58 (fig. 2) for a reading of .1000 MΩ on digital indication.
(2) Adjust R64 (fig. 2) for a reading of .9500 M.
17. Final Procedure
a. Deenergize and disconnect all equipment.
b. Annotate and affix DA label/form in accordance with TB 750-25.
SECTION V
CALIBRATION PROCESS FOR CONSOLIDATED AIRBORNE SYSTEMS, MODEL
TF20-1 AND TF579
18. Preliminary Instructions
a. The instructions outlined in paragraphs 18 and 19 are preparatory to the calibration
process. Personnel should become familiar with the entire bulletin before beginning the
calibration.
b. Items of equipment used in this procedure are referenced within the text by common
name as listed in table 2.
c. Unless otherwise specified, verify the result of each test and, whenever the test
requirement is not met, take corrective action before continuing with the calibration.
Adjustments required to calibrate the TI are included in this procedure.  Additional
maintenance information is contained in the manufacturer's manual for this TI.
d. Unless otherwise specified, all controls and control settings refer to the TI.
19. Equipment Setup
WARNING
HIGH VOLTAGE is used or exposed during the performance of
this calibration. DEATH ON CONTACT may result if
personnel fail to observe safety precautions. REDUCE
OUTPUT(S) to minimum after each step within the
performance check where applicable.
a. Remove top protective cover as required for adjustments.
b. Connect autotransformer to 115 V, 400 Hz source and adjust for 115 V.
c. Connect TI to autotransformer using cables supplied with TI.
d. Set POWER ON/OFF switch to on and allow at least 30 minutes for warm-up and
stabilization.

Privacy Statement - Press Release - Copyright Information. - Contact Us