Click here to make tpub.com your Home Page

Page Title: Final Procedure
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Table 6. Resistance
Up
TB-9-4920-451-35 Fuel Quantity Gage Test Set Simmons Precision Inc. Model 472090-002 Gull Airborne Instruments Model GTF-4 Manual
Next
Capacitance

TB 9-4920-451-35
b. Adjustments
(1) Set MEGOHMMETER OFFSET trimmer screw (fig. 1) for meter indication that is
the same value as stamped above S8 switch (fig.1) (R).
(2) Set MEGOHMMETER GAIN (fig. 1) until meter agrees with value stamped above
switch S9 (fig.1) (R).
12. Final Procedure
a. Deenergize and disconnect all equipment.
b. Annotate and affix DA label/form in accordance with TB 750-25.
SECTION IV
CALIBRATION PROCESS FOR
GULL AIRBORNE INSTRUMENTS, MODEL GTF-4
13. Preliminary Instructions
a. The instructions outlined in paragraphs 13 and 14 are preparatory to the calibration
process. Personnel should become familiar with the entire bulletin before beginning the
calibration.
b. Items of equipment used in this procedure are referenced within the text by common
name as listed in table 2.
c. Unless otherwise specified, verify the result of each test and, whenever the test
requirement is not met, take corrective action before continuing with the calibration.
Adjustments required to calibrate the TI are included in this procedure.  Additional
maintenance information is contained in the manufacturers' manuals for this TI.
d. Unless otherwise specified, all controls and control settings refer to the TI.
14. Equipment Setup
WARNING
HIGH VOLTAGE is used or exposed during the performance of
this calibration. DEATH ON CONTACT may result if
personnel fail to observe safety precautions. REDUCE
OUTPUT(S) to precautions. REDUCE OUTPUT(S) to
minimum after each step within the performance check where
applicable.
a. Remove top protective cover as required for adjustments.
b. Connect TI to 115 V, 400 Hz, using cables supplied with TI.
c. Set POWER ON/OFF switch to ON and allow at least 30 minutes for warm-up and
stabilization.

Privacy Statement - Press Release - Copyright Information. - Contact Us