Click here to make tpub.com your Home Page

Page Title: Final Procedure
Back | Up

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Vacuum
Up
TB-9-4920-367-35 Spar Blade Checkinng and Filling Unit and Spar Blade Checking Unit Sikorsky Part Numbers S1670-15002-2 Manual

TB 9-4920-367-35
(7) Close nitrogen tank valve and adjust regulator (B5) for zero output.
(8) Adjust pneumatic pressure controller for zero indication on TI.
(9) Close inlet valve and slowly open exhaust valve on pneumatic pressure
controller.
b. Adjustments. No adjustments can be made.
10. Final Procedure
a. Deenergize and disconnect all equipment and reinstall protective cover on TI.
b. When all parameters are within tolerance, annotate and affix DA Label 80 (US
Army Calibrated Instrument).  When the TI receives limited or special calibration,
annotate and affix DA Label 163 (US Army Limited or Special Calibration). When the TI
cannot be adjusted within tolerance, repair the TI in accordance with the maintenance
manual. When repair is delayed for any reason or the TI cannot be repaired with local
resources, annotate and affix DA Form 2417 (US Army Calibration System Rejected
Instrument) and inform the owner/user accordingly in accordance with TB 750-25-1.
7

Privacy Statement - Press Release - Copyright Information. - Contact Us