Click here to make tpub.com your Home Page

Page Title: Equipment Setup
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
SECTION III CALIBRATION PROCESS
Up
TB-9-4920-362-35 Test Box Assy Pilt Assist/Nulling Sirkorsky Model 70700-20678-041 Manual
Next
Dc Voltage

TB 9-4920-362-35
NOTE
Unless otherwise specified, verify the result of each test and,
whenever the test requirement is not met, take corrective
action before continuing with the calibration.  Adjustments
required to calibrate the TI are included in this procedure.
Additional maintenance information is contained in TM 55-
4920-414-13&P for this TI.
NOTE
Unless otherwise specified, all controls and control settings
refer to the TI.
7. Equipment Setup
a. Position controls as listed in (1) through (6) below:
(1) AC POWER switch to OFF.
(2) DC POWER switch to OFF.
(3) TRIM switch to OFF.
(4) SAS switch to OFF.
(5) BOOST switch to OFF.
(6) POWER AC and DC circuit breakers to IN.
b. Connect autotransformer (A1) to AC POWER connector, using cable supplied with
TI.
c. Connect autotransformer to a 115-V ac, 60-Hz power source and adjust for 115-V ac
output.
d. Connect dc power supply (A2) positive terminal to DC POWER connector pin B and
negative terminal to pin A, using two leads (B5).
e. Connect digital voltmeter (A4) to dc power supply, using leads (B3 and B4).
f. Adjust dc power supply for a 28-V dc indication on digital voltmeter and then
disconnect digital voltmeter from equipment setup.
g. Set AC POWER and DC POWER switches to ON and allow at least 20 minutes for
equipment to warm-up.
4

Privacy Statement - Press Release - Copyright Information. - Contact Us