Click here to make tpub.com your Home Page

Page Title: Figure 1. Power supply - equipment setup
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
SECTION III CALIBRATION PROCESS
Up
TB-9-4920-361-24 Vertical Display System Line Test Set Cavadian Marconi Model 476-853 and Bench Test Set Canadian Marconi Model 476-854 Manual
Next
Figure 2. Simulator unit - pin locations

TB 9-4920-361-24
Figure 1. Power supply - equipment setup.
d. Adjust autotransformer output for 115 V.
e. Connect multimeter to dc power supply and adjust dc power supply for a 28 V
output indication on multimeter.
f. Disconnect multimeter from equipment setup.
g. Set ON-OFF-SIM ONLY switch to ON and allow at least 30 minutes for warm-up.
h. Set ON-OFF-SIM ONLY switch to OFF.
CAUTION
To prevent damage to TI, always turn power off before making
connections.
8. Output Voltages
a. Performance Check
(1) Connect multimeter between TI connector No. 1 pins FF (HI) and HH (LO).
Refer to figure 2 for pin locations.
(2) Set ON-OFF-SIM ONLY switch to SIM ONLY and INTEGRAL LIGHTING switch to
INT. Multimeter will indicate between 4.0 and 6.0 V ac.
(3) Set ON-OFF-SIM ONLY switch to OFF.
(4) Connect multimeter between connector No. 1 pins P (HI) and EE (LO), refer to figure 2.
(5) Set ON-OFF-SIM ONLY switch to ON.
If multimeter does not indicate
between 11.5 and 12.5 V dc, perform b below.
(6) Set ON-OFF-SIM ONLY switch to OFF.

Privacy Statement - Press Release - Copyright Information. - Contact Us