Click here to make tpub.com your Home Page

Page Title: Figure 1. Depth gage - equipment setup
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
SECTION III CALIBRATION PROCESS FOR DEPTH GAGES 0-460 FSW AND PRESSURE GAGES -5 TO 30 PSI
Up
TB-9-4220-215-35 Calibration Procedure for Depth Gages (General) Manual
Next
Table 2. Depth Gage Check 0-230 fsw

TB 9-4220-215-35
a. Connect equipment as shown in figure 1.
Figure 1. Depth gage - equipment setup.
WARNING
To prevent injury to personnel or damage to equipment, make
certain that all components are within the range of the unit to
be calibrated and all connections are securely sealed prior to
applying pressure to TI. Never attempt to tighten connections
with pressure applied.
b. Position controls on pneumatic pressure standard as indicated in (1) through (7)
below:
(1) Set POWER switch to ON and allow 1 minute for warm-up.
(2) Press SOURCE pushbutton to INT.
(3) Press UNITS DISPLAYED pushbutton to PSIA.
(4) Press RANGE pushbutton to 0-250.
(5) Press SENSITIVITY pushbutton to HIGH.
(6) Press RESET pushbutton.
(7) Press ZERO pushbutton.
c. Adjust regulator fully ccw.
d. Open nitrogen tank valve and adjust regulator until output gage indicates 210 psi.
4

Privacy Statement - Press Release - Copyright Information. - Contact Us