Click here to make tpub.com your Home Page

Page Title: Section III PRELIMINARY OPERATIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Table 3. Accessories Required
Up
TB-55-4920-431-35 Auxiliary Power Unit-Electronic Sequence Unit Multipurpose Test Set P/N 161226-200 Manual
Next
Figure 1. Speed/Temperature - Equipment Setup

TB 55-4920-431-35
Section III
PRELIMINARY OPERATIONS
7.
Preliminary
Instructions.
a.  The instructions outlined in this section are preparatory to the calibration
process. Personnel should become familiar with the applicable sections before
beginning the calibration.
b . Items of equipment used in this procedure are referenced within the text by
common name and item identification number as listed in tables 2, 3, and 4. For
the identification of equipment referenced by item numbers prefixed with A (See
table 2), for prefix B (See table 3), and for prefix C (See table 4).
HIGH VOLTAGE is used or exposed during the
performance of this calibration. DEATH ON
CONTACT may result if personnel fail to
observe safety precautions.
Unless otherwise specified, all controls and
control settings refer to the TI.
Equipment Setup.
8.
Set all switches on TI to down position.
a.
b.
Check both TI meters for mechanical zero and adjust if necessary.
c.
Connect test equipment as shown in figure 1 connection A.
d.  Adjust DC power supply (A4) for 28 vdc + 0.5 vdc as indicated on digital
--
multimeter (A1).
Test equipment power will be switched off
before making or removing jumper and/or
test equipment connections.
5

Privacy Statement - Press Release - Copyright Information. - Contact Us