Click here to make tpub.com your Home Page

Page Title: Equipment Setup.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
SECTION III PRELIMINARY OPERATIONS
Up
TB-55-4920-429-35 Calibration Procedure for Advanced Flight Control System Line Set P/N 145G0009-1 Manual
Next
Figure 1. Equipment Power Setup.

TB
55-4920-429-35
8.
Equipment Setup.
a.
Set both TI MASTER Power switches to OFF.
Observe TI
analog meter for ZERO.
If not, remove bottom front protective
cover plate from meter and mechanical ZERO meter.
Push in the 3 circuit breakers.
b.
c.
Connect the test equipment as shown in figure 1.
d.
Adjust Autotransformer (A1) for 115 vat, 400 Hz
as indicated on digital multimeter (A3).
Disconnect digital multi-
meter leads from connection A.
e.
Connect digital multimeter leads to connection B and adjust
DC power supply (A2) for 28 vdc ±0.5 vdc as indicated on digital
multimeter (A3).
Disconnect digital multimeter from connection B.
f.
Set TI 115 vac POWER Switch to ON.
Set TI 28 vdc POWER Switch to ON.
g.
Allow TI 30.0 minutes warm-up period for the TI DMM to
h.
settle out before performing calibration.
NOTE
TI Power supply adjustments are shown in
10

Privacy Statement - Press Release - Copyright Information. - Contact Us