| ||||||||||
|
|
![]() ![]() TB 55-4920-428-35
C1
HEADQUARTERS
CHANGE
DEPARTMENT OF THE ARMY
NO. 1
WASHINGTON, D.C., 30 SEPTEMBER 1992
CALIBRATION PROCEDURE
FOR
CH-47 INTEGRATED LOWER CONTROL ACTUATOR (ILCA)
BENCH TEST SET
P/N 145GS278-1
TB 55-4920-428-35, 19 July 88, is changed as follows:
1. Remove and insert pages as indicated below. New or changed text material
is indicated by a vertical bar in the margin. An illustration change is indicated
by a miniature pointing hand.
Remove pages
Insert pages
1 through 4
1 through 4
19 through 24
19 through 24
29/30 blank
29/30 blank
Cover 1/2
Cover 1/2
2.
Retain this sheet in front of manual for reference purposes.
By Order of the Secretary of the Army:
GORDON R. SULLIVAN
GeneraI, United States Army
Official:
Chief of Staff
MILTON H. HAMILTON
Administrative Assistant to the
Secretary of the Army
DISTRIBUTION:
To be distributed in accordance with DA Form 12-34-E, block no. 1691, requirements
for TB 55-4920-428-35.
Distribution Statement A:
Approved for public release; distribution is unlimited.
|
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |