| ||||||||||
|
|
![]() ![]() TB 55-4920-428-35
C3
HEADQUARTERS
CHANGE
DEPARTMENT OF THE ARMY
WASHINGTON, D.C., 18 September 1996
NO.
3
CALIBRATION PROCEDURE
FOR
CH-47 INTEGRATED LOWER CONTROL ACTUATOR (ILCA)
BENCH TEST SET
P/N 145GS278-1
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
TB 55-4920-428-35, 19 July 1988, is changed as follows:
1. Remove and insert pages as indicated below. New or changed text material is indicated by a vertical
bar in the margin. An illustration change is indicated by a miniature pointing hand.
Insert pages
Remove pages
1 and 2
23 and 24
2. Retain this sheet in front of manual for reference purposes.
By Order of the Secretary of the Army:
DENNIS J. REIMER
General, United Stares Army
Chief of Staff
DISTRIBUTION:
To be distributed in accordance with DA Form 12-34-E, block no. 1691, requirements for
TB 55-4920-428-35.
|
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |