Click here to make tpub.com your Home Page

Page Title: Meter Phase
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Equipment Setup
Up
TB-55-4920-346-34 Calibration Procedure for Environment Control Test Set NSN 4920-00-111-5372 GRUMMAN MODEL A/E24T-102 Manual
Next
Figure 2. Meter Phase Circuit Jumper Setup

TB 554920-346-34
Figure 1. Inductor Equipment Setup (Front View)
(7) Disconnect signal generator test lead from L2 pin 1 and connect to L3 pin 2. Remove voltmeter test lead
from terminal E35 and connect to E32.
(8)
Voltmeter will indicate between 12 and 12.5 vac. If not, perform b(3) below.
(9)  Disconnect signal generator test lead from L3 pin 2 and connect to L4 pin 2. Remove voltmeter test lead
from terminal E32 and connect to E31.
(10) Voltmeter will indicate between 12 and 12.5 vac. If not perform b(4) below.
(11) Disconnect test equipment.
b. Adjustments
(1)
Adjust inductor L1 for 12.25 vac.
(2)
Adjust inductor L2 for 12.25 vac.
(3)
Adjust inductor L3 for 12.25 vac.
(4)
Adjust inductor L4 for 12.25 vac.
9. Meter Phase
a. Performance Check.
(1) Connect a test lead (B2) between potentiometer R7 and terminal E15 as shown in figure 2, using two
adapters (B5).
(2) Connect equipment as shown in figure 3.
6

Privacy Statement - Press Release - Copyright Information. - Contact Us