Click here to make tpub.com your Home Page

Page Title: Section IV. CALIBRATION PROCESS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Section III. PRELIMINARY OPERATIONS
Up
TB-55-4920-343-35-1 Calibration Procedure for Simulator Self-Tuning Vibration Absorber System P/N 114G1409-1 and 114G5090-1 Manual
Next
Ripple Voltage.

TB 55-4920-343-35/1
e. Set S1 switch to ON. Phase indicator must light.
f. Allow time for equipment to warm up and stabilize.
Section IV. CALIBRATION PROCESS
NOTE
Unless otherwise specified, verify the results of each test and take corrective action whenever
the test requirements are not met before continuing with the calibration.
4-1.
Operating Voltage.
a. Performance Check.
(1) Connect equipment as shown in figure 4-1.
(2) Set multimeter (Al) range switch setting to the 50 vdc position.
Figure 4-1. Operating voltage-equipment setup.
5