Click here to make tpub.com your Home Page

Page Title: Figure 3. AIR FLOW gage performance check, equipment setup
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 2. Location of TI controls and instruments used during calibration.
Up
TB-3-6665-315-50 Calibration Procedure for Indicator Resistance Inhilation and Exhaltion Q213 Manual
Next
Table 4. RESISTANCE Gage Performance Limits

Figure 3. AIR FLOW gage performance check, equipment setup.
CAUTION
9.
RESISTANCE Gage. a. Performance Check.
(1) Connect the test equipment as shown in
Since a sudden change in pressure could
damage  the  TI,  do  not  disconnect  the
(2) Close valve (B6).
equipment  before  returning  the  TI  to
(3) Adjust the valve on the nitrogen cylinder
atmospheric pressure.
(B4) and regulator (B5) until the RESISTANCE gage
(5) After
the
performance
check
is
pointer indicates" 2" on the scale. The manometer (A2)
completed, close the valve on the nitrogen cylinder (4)
must indicate as shown in table 4.
and slowly open valve (B6) to return the system to
(4) Repeat (3) above for each major division
atmospheric pressure.
on the RESISTANCE gage scale.
(6) Disconnect the test equipment.
b.  Adjustment. No adjustments can be made.
Figure 4. Resistance gage performance check, equipment setup.
5

Privacy Statement - Press Release - Copyright Information. - Contact Us