Click here to make tpub.com your Home Page

Page Title: Table 3. Accessories Required
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
SECTION II EQUIPMENT REQUIREMENTS
Up
TB-3-6665-315-50 Calibration Procedure for Indicator Resistance Inhilation and Exhaltion Q213 Manual
Next
Figure 2. Location of TI controls and instruments used during calibration.

Table 3. Accessories Required
Item
Common Name
Description and Part Number
B1
CONNECTOR *
Fabricate in accordance with figure 1.
B2
TUBING
Plastic, 1/4-inch (R3603F). Length as required.
B3
TEE
Connector, elastic tubing, branded, 3/s-inch ID, Y4-inch to /s-inch OD (7909927).
B4
NITROGEN CYLINDER
Nitrogen, technical w/cyl, oil free (7910373).
B5
REGULATOR
Regulator, water pumped nitrogen (MIS10325TYPE2)
B6
VALVE
Needle valve, '/s-inch NPT female, inlet and outlet; ROSKA 2001.
* Also used to calibrate the following equipment:
Tester, Air Leakage (Dry Bubble), Q204 (TB 3-6665-313-50)
Tester, Leakage, Valve Assembly, Q210 (TB 3-6665-314-50)
SECTION III
CALIBRATION PROCESS
prefixed with A, see table 2, and for prefix B, see table
NOTE
Unless otherwise specified, verify the results
7.
Equipment Setup. (fig. 2).
a.
Adjust the
of each test and take corrective action
mechanical zero-adjustment on TI resistance gage to
whenever the test requirement is not met
zero.
before continuing with the calibration.
b.  Set the POWER switch to OFF.
6.  Preliminary Instructions.  a.  The instructions
c.  Set INHALE-EXHALE switch to center off
outlined in this section are preparatory to the calibration
position.
process.  Personnel should become familiar with the
d.  Set SEAL switch to OFF.
entire bulletin before beginning the calibration.
e.  Turn AIRFLOW VALVE fully counterclockwise.
b.  Items of equipment used in this procedure are
f.
Connect power cable connector to 115-volt, 60
referenced within the text by common name and item
Hz receptacle.
identification number as listed in tables 2 and 3. For the
g.  Set POWER switch to ON.  Pump should
identification of equipment referenced by item numbers
operate.
h.  Allow TI to operate for at least 10 minutes.
3

Privacy Statement - Press Release - Copyright Information. - Contact Us