Click here to make tpub.com your Home Page

Page Title: SECTION III CALIBRATION PROCESS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
SECTION II EQUIPMENT REQUIREMENTS
Up
TB-3-6665-314-50 Calibration Procedure for Tester Leakage Valve Assembly Q210 Manual
Next
Table 4. Pressure Gage Performance Limits

TB 3-6665-314-50
SECTION III
CALIBRATION PROCESS
identification of equipment referenced by item numbers
NOTE
prefixed with A, see table 2, and for prefix B, see table 3.
Unless otherwise specified, verify the
7. Equipment Setup (fig. 2). a. Adjust mechanical
results  of  each  test  and  take
zero-adjustment on the TI PRESSURE gage.
corrective action whenever the test
b. Set POWER switch to OFF.
requirement  is  not  met  before
c. Turn BLEED VALVE fully counterclockwise.
continuing with the calibration.
d. Connect power cable connector to 115-volt, 60
Hz receptacle.
6.  Preliminary Instructions.  a.  The instructions
e. Set POWER switch ON. Motor should operate.
outlined in this section are preparatory to the calibration
f
Allow TI to operate for at least 10 minutes.
process.  Personnel should become familiar with the
entire bulletin before beginning the calibration.
b. Items of equipment used in this procedure are
referred within the text by common name and item
identification number as listed in tables 2 and 3. For the
Figure 2. Locations of TI controls and instruments used during calibration.
3

Privacy Statement - Press Release - Copyright Information. - Contact Us