Click here to make tpub.com your Home Page

Page Title: Preliminary Procedures
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
General Instructions
Up
TB-11-6625-821-35 Calibration Procedures for Direction Finder Set AN/ARM-93 Manual
Next
Frequency Measurement.

TB 11-6625-821-35
7. Preliminary Procedures
a. No preliminary procedures are required to prepare the unit under test for
calibration.  However, procure the following parts to fabricate a cable necessary for
calibration:
Connector, MS 3106A-14S-5S
Clamp, AN 3057-6A
Wire, copper, insulated, stranded, No. 16 AWG (20 ft long)
Spaghetti 3/4 inch diameter (4 ft long)
b. Fabricate a cable for the BEARING INDICATOR in accordance with the details in
figure 1. This cable is required to connect the BEARING INDICATOR to power and to
provide test points.
NOTE
When the performance check (a below) is within tolerance, do
not perform the corresponding adjustment (b below). When the
performance check is not within tolerance, perform the
corresponding  adjustment  before  continuing  with  the
calibration procedure.  When the performance check is not
within tolerance and no adjustment is specified, the deficiency
must be corrected before continuing with the procedure.
8. Static Power Inverter CV-2128/ARN-83 Output
a. Performance Procedure
(1) Voltage measurements.
(a) Connect the equipment as shown in figure 2.
Figure 2. Test equipment connections for voltage measurement of Static Power Inverter
CV-2128/ARN-83 output.
4

Privacy Statement - Press Release - Copyright Information. - Contact Us