Click here to make tpub.com your Home Page

Page Title: SECTION III PRELIMINARY OPERATIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
SECTION II EQUIPMENT  REQUIREMENTS
Up
TB-11-6625-620-35-1 Calibration Procedure for Teletypewritter Tint Set TS-799/UGM-1 Manual
Next
Table 4.1. Baud Rate Frequencies

TB 11-6625-620-35-1
SECTION III
PRELIMINARY OPERATIONS
NOTE
It is recommended that personnel familiarize themselves with the entire procedure before
performing calibration.
b. Connect the other end of power cable to the 115
3-1. Precaution. Before individual test equipment
is connected into the calibration system, the
or 230 volt source required for proper operation, ob-
serving POWER switch position.
following precautions should be taken to prevent
damage to equipment.
CAUTION
3-2. Test Instrument Controls. a. Set BAUDS
RATE switch to 75 BAUDS.
Make certain that the power cable is not
connected to 230 volts ac when the power
b. Set MESSAGE SELECT switch to DOT CY.
switch locking guard device indicated the
c. Loosen % DISTORT LOCK.
d. Turn % DISTORT to O.
power toggle switch to be into the 115 volt
e. Set DISTORT SELECT to BIAS SPACE.
position.
a. Connect power cable to the Test Instrument con-
f. Disregard all other switch positions.
nection AC POWER.
g. Allow 5 minutes for equipment warmup.
SECTION IV
CALIBRATION PROCESS
4-1. Baud Bate Frequency Test. a. Performance
{1) Connect the Test Instrument as shown in
Check.
Figure 1. Teletypewriter Test Set TS-799/UGM-1, distortion and baud rate test equipment setup.
3

Privacy Statement - Press Release - Copyright Information. - Contact Us