Click here to make tpub.com your Home Page

Page Title: Final Procedure
Back | Up

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 3. Electronic Voltmeter ME-227/U - rear view.
Up
TB-11-6625-610-35-1 Calibration Procedure for Electronic Volmeter ME-227/U Manual

Figure 4. Electronic Voltmeter ME-227/U - 10 mv and 25 mv ranges check, equipment setup.
b. Adjustments.
11. Final Procedure. a. Deenergize and disconnect
(1)  Adjust left zero 10 mV AND UP potentiometer
all test equipment, and install rear cover on unit under test.
(fig. 3) for indications within limits listed in table
b.  In accordance with TM 38-750, annotate and affix
2.
calibration DA Label 80 (U.S. Army Calibration System).
(2)  If adjustment is required, repeat steps in 9a,
When the unit under test cannot be adjusted to within
adjusting 10mV AND UP potentiometer for
tolerance,  annotate  and  affix  DA  Form  2417
optimum results in both step 9a and 10a.
(Unserviceable Test Instrument or Standard) (red tag).
TOGA 640A
7

Privacy Statement - Press Release - Copyright Information. - Contact Us