Click here to make tpub.com your Home Page

Page Title: Section III. PRELIMINARY OPERATIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Section II. EQUIPMENT REQUIREMENTS
Up
TB-11-6625-2932-35 Calibration Procedure for Cathode for Cathode Relay Tester Siemens & Halske 9 Tmse 109 Manual
Next
Power Voltages and Current.

Section III. PRELIMINARY OPERATIONS
TB 11-6625-2932-35
6. Preliminary Instructions. a. The instruction outlined
tenance information is contained in
in this section are preparatory to the calibration process.
the manufacturer's manual for this
Personnel should become familiar with the entire bulletin
Test Instrument.
before beginning the calibration.
b. Items of equipment used in this procedure are
NOTE
referenced within the text by common name and item
Do not perform power voltages and
number identification as listed in table 2 and 3. For the
current check unless out of tolerance
identification of equipment referenced by item numbers
conditions in the preceeding checks
prefixed with A, see table 2, and for prefix B, see table 3.
cannot be corrected by adjusting the
WARNING
specified component
HIGH VOLTAGE is used during the
7. Equipment Setup.
performance  of  this  calibration.
NOTE
DEATH ON CONTACT may result if
Determine if the TI being calibrated is
personnel fail to observe safety pre-
the special version that operates from
cautions
a 60Hz power frequency source or the
NOTE
version that operates from a 50Hz
power frequency source before apply-
Unless otherwise specified, verify the
ing power.
results of each test and, whenever the
test requirement is not met, take
corrective action before continuing
a. Set TI front panel switch 110V 125V 150V 220V
with the procedure. Additional main-
240V to the appropriate setting according to the available
voltage source to be used.
b. Energize TI and allow sufficient time for warmup and
stabilization.
Section IV. CALIBRATION
(2) Connect audio oscillator (Al) to TI ground and to
8. Deflection Voltage. a. Performance Check.
contact 4 (fig. 1) of the socket for relay T rls 43.
(1) Set TI shift control to a midrange position and
the changeover switch to distortion.
Figure 1. A. Socket for relay, pin connections.
B. Cathode ray relay tester, display.
3

Privacy Statement - Press Release - Copyright Information. - Contact Us