SECTION II CALIBRATION
Up
TB-11-5995-207-35-2 Calibration Procedure for Montor Electrical Power MX-8570/APS-94D Manual
Next
VOLTAGE AC PHASE A Meter Calibration Accuracy

Figure 2. Text fixture.
NOTE
7. Preliminary Procedures.  a.  Trip 115 VOLT AC
The following paragraphs are divided into
CIRCUIT BREAKER (fig. 1) and 28 VOLT DC CIR
subparagraph a, performance check, and sub-
CUIT BREAKER of unit under test.
b. Connect equipment as shown in figure 3.
paragraph b, adjustments. When the per-
formance check is not within tolerance and no
c. Connect voltmeter to test jacks J1 and J4 of
adjustment is specified, the deficiency must be
power monitor test fixture with test leads.
d. Adjust voltmeter for 115 volt AC operation.
corrected before continuing with the procedure.