|
| |
Back Figure 3-10. Instrument Panel Controls | Up TM-55-6695-220-13P Transportabilty Guidance Receiving Sets AN/MSQ-103A/C Receiving Sets AN/MSQ-103B Lightweight Receiving Set Manual | Next 3-16. BATTERIES- INSPECT/REPLACE |
3-15.
PANEL CONTROLS - INSPECT/REPLACE. (Contd)
3-15
b.
Installation.
(1) Replace entire switch assembly with new one, installing new plugs P1 and P2 and securing control with two
machine screws (See Figure 3-11).
(2) Install instrument panel in case, aligning eight screw holes.
(3) Use medium screwdriver to secure panel with eight screws.
END OF TASK
Figure 3-11. Instrument Panel Switch Assembly
3-28
|