Click Here to
Order this information in Print

Click Here to
Order this information on CD-ROM

Click Here to
Download this information in PDF Format

 

Click here to make tpub.com your Home Page

Page Title: Figure 5 PCS Temperature vs. Hydrotest Pressure
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   
Back
Figure 4   PCS Temperature vs. Pressure for Normal Operation
Up
Material Science Volume 2 of 2
Next
Minimum  Pressurization-Temperature  Curves  Summary

DOE-HDBK-1017/2-93 Brittle Fracture MINIMUM PRESSURIZATION-TEMPERATURE CURVES If the limit of the MPT curve is exceeded during critical operation, the usual action is to scram the reactor, cool down and depressurize the PCS, and conduct an engineering evaluation prior to further plant operation. During hydrostatic testing, minimum pressurization temperature precautions include making sure that desired hydrostatic pressure is consistent with plant temperatures so that excessive stress does not  occur.    Figure  5  shows  MPT  curves  for  hydrostatic  testing  of  a  PWR  PCS.    The  safe operating region is to the right of the MPT curves.   Other special hydrostatic limits may also apply during testing. Figure 5   PCS Temperature vs. Hydrotest Pressure Rev. 0 Page 9 MS-04

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing