Click Here to
Order this information in Print

Click Here to
Order this information on CD-ROM

Click Here to
Download this information in PDF Format

 

Click here to make tpub.com your Home Page

Page Title: Example 1
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   
Back
Example 1
Up
Engineering Symbology Prints and Drawings Volume 2 of 2
Next
Example 2

Logic Diagrams DOE-HDBK-1016/2-93 TRUTH TABLES AND EXERCISES Rev. 0 Page 15 PR-05 1. Identify by number the following logic symbols:               a.   AND               b. OR               c.   Time delay               d.   Retentive-Memory 2. How long must the safety signal be present before the time delay (1) will pass an output (on) signal to Gate 2? 3. Under what conditions will Gate 2 turn on? 4. Under what conditions will the low flow alarm (5) sound? 5. Since  the  control  switch  is  always  in  the  AUTO  position  (due  to  the  spring  return feature), what logic gate keeps the continuous on signal that is generated by the control switch being in the AUTO position from starting the fan?  What signal must also be present to allow the AUTO signal to start the fan? 6. If  12  minutes after first receiving a safety signal, with the fan control switch in the AUTO position, the safety signal is removed (off), what will happen to the fan?  Why? 7. How many ways can the fan be started?  How many ways can the fan be stopped?

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing