Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: OPERATION PROCEDURES (OP) FOR DIVING OPERATIONS 3
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home




   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
OPERATION PROCEDURES (OP) FOR DIVING OPERATIONS 3
Up
TM-5-4220-231-14P Recompression Chamber 3-Person Model RC-100-2 Serial Numbers 08-A-163 Thru 08-A-172 Manual
Next
OPERATION PROCEDURES (OP) FOR DIVING OPERATIONS 4



TM5-4220-231-14&P OPERATION PROCEDURES  (OP) FOR DIVINGOPERATIONS OPERATOR CHECKLISTOP 3 DATE-/-/- STARTTIME END   TIME OPERATOR1 OPERATOR 2 LOCATION STEP ITEM LOCATION ACTION PERFORMED CHECKED IBY BY POST-DIVE SHUT    DOWN   OP   3.1 (Cont.) 3.1.16 AHP-V403 DACC    -   HP,  LP, Close CW. ALP-V404 and     Console Close CW. ALP-V414 Pressure Gage Close CW. Isolation Valves AHP-V407 Close CW. ALP-V408 Close CW. 3.1.17 ALP-V411 DACC- Close CW. ALP-V412 Control Panel Close CW. 3.1.18 ALP-V504 VTA  - Slowly     open     CCW. Drain    valve Allow    moisture to   drain. Close CW. 3.1.19 ALP-V509 VTA  - Close CW. Control Panel 3.1.20 SDASS Bleed all  umbilicals down from diving     helmets. Remove all   umbilicals. (Air  and Pneumo hoses), HP,   LP,  and Interconnecting hoses from system. Replace protective caps as each hose is  disconnected. 3.1.21 SDASS Perform After    Operation PMCS IAW  Table     2-1. Conducted By: Rank: Date/Time Verified By: Rank:, Date/Time Supervisor: Rank:. Date/Time 2-52 Change 6



Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing