Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Daily Predive Procedures (Cont)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home




   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Daily Predive Procedures (Cont)
Up
TM-5-4220-225-14 Firefighting Truck 100 Ft Aerial Ladder 1000 GPM Manual
Next
Daily Predive Procedures (Cont)



TM 5-4220-225-14 Table 2-3.  Daily Predive Procedures (Cont). Step Procedure (2) Remove diaphragm retainer and inspect diaphragm for damage and deterioration. (3) Apply a light film of lubricant to bead of diaphragm and install diaphragm and ambient diaphragm retainer.  Ensure diaphragm seats properly. (4) Install ambient exhaust valve cover. g. Breech Ring Check. (1) Set helmet on top viewport retainer and visually inspect breech ring for dents, nicks, and corrosion.  Ensure preformed packing groove is clean. (2) Visually inspect breech ring for damaged, loose or missing mounting screws.If loose, tighten as necessary. (3) Inspect O-ring for nicks, cuts, deterioration and proper size. Apply a thin film of lubricant to preformed packing and install it in helmet breech ring groove. h. Air Supply Whip Check. (1) Remove protective cap from air whip; inspect the fitting for corrosion or damage. (2) Ensure gasket is in good clean condition.  Replace if required. Apply a light film of lubricant. i. Communication Whip Assembly Check. Remove protective cap from communications whip and inspect for cuts, sharp bends, corroded contacts, and damaged threads. 2-33



Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing