Click here to make tpub.com your Home Page

Page Title: Section III. TOOLS AND TEST EQUIPMENT REQUIREMENTS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home



   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Section II. MAINTENANCE ALLOCATION CHART
Up
TB-5-4220-200-12-1 Open Circuit Scuba System Manual
Next
Appendix E. REPAIR PARTS, STANDARD TOOLS, SPECIAL TOOLS AND TEST EQUIPMENT



TB 5-4220-200-12-1
Section III. TOOLS AND TEST EQUIPMENT REQUIREMENTS
4
(1)
(2)
(3)
TOOL NUMBER
REFERENCE
NOMENCLATURE
NATIONAL NATO
MAINTENANCE
STOCK NUMBER
CODE
CATEGORY
1
C
Gauge, Tank Pressure
4220-01-003-2375
28-074-000 (Under
Sea, Inc.) 7400-00
(US Divers)
2
Gauge, Diver's Pressure
4220-00-099-8024
7004
C
3
O
Screwdriver, Off set, 5/32"
5120-00-287-2129
4
N/A
Pressure Test Gauge
O
1116-00
5
N/A
O
Adapter
1100-01
6
Hose Assembly
N/A
1048-04
O
7
Plastic Tool (PFI)
O
1588-13
N/A
N/A
8
Wrench, HP Block Assy Guide
O
1110-00
9
Wrench, Retainer
O
N/A
1100-05
10
Screwdriver (Modified)
O
5120-00-227-7338
11
5120-00-277-9075
O
Wrench, Set, Spanner (Modified)
12
O
Wrench, Open End
5120-00-203-4808
Section IV. REMARKS
REFERENCE CODE
REMARKS
A
Refer Code 1, Section III. Regulator Attachable and underwater adapter to indicate
TANK AIR PRESSURE.
B
Refer Code 2, Section Ill. Used to indicate tank air pressure (tank servicing).
C
Refer Code 3, Section III. Modify screw driver in accordance with Figure 4-8.
D
Annual visual internal tank inspection.
E
Hydrostatic test of 5/3 times the maximum allowable working pressure of the tanks ev-
ery 5 years.
F
Clean tanks internally if required upon completion of reference Code D above.
G
Upon reassembly of the first stage regulator insure the mainspring cavity is filled with
silicone fluid P/N 1088-55 to prevent "freezing up" of the mainspring.
H
Adjust the first stage intermediate pressure to pressure setting of 130 ± 5 PSIG.
I
Refer Code 10. Section III. Modify wrench set and spanner in accordance with Figure
J
Test gauge, tank pressure at least every 6 months against a calibrated master refer-
ence gauge.
K
Test gauge, divers pressure at least every 6 months against a calibrated master refer-
ence gauge.
D-4



Privacy Statement - Press Release - Copyright Information. - Contact Us