Click here to make tpub.com your Home Page

Page Title: Table 3-1. WEEKLY PREVENTIVE MAINTENANCE CHECKS AND SERVICES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home



   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Chapter 3 OPERATORS MAINTENANCE INSTRUCTIONS
Up
TB-5-4220-200-12-1 Open Circuit Scuba System Manual
Next
Chapter 4 UNIT MAINTENANCE INSTRUCTIONS



TB
5-4220-200-12-1
Table 3-1. WEEKLY PREVENTIVE MAINTENANCE CHECKS AND SERVICES
W-WEEKLY
TOTAL MANHOURS REQUIRED 0.5
Work
Sequence
Item to be Inspected
Number
Procedure
Time
M/H
1
TANKS
Inspect tanks, manifold assembly. tank stabilizer bands, for rust. corrosion and dam-
0.1
age. Tighten exterior screws. bolts, and nuts carefully after inspecting for thread dam-
age. Inspect harness straps for wear or damage. Insure that tanks. manifold and har-
ness are free of dirt, verdigris and other foreign matter. Check tanks to verify next re-
quired hydrostatic test (every 5 years). Verify next required internal (visual) tank in-
spection.
2
DEMAND REGULATOR
Inspect hose for dry rot, cuts; hose connectors for proper seating and thread damage.
0.1
Clean filter and inspect for damage. Conduct air leakage test: with the first stage regu-
lator cap assembly seated, attempt to breathe from the second stage regulator. Any air
received indicates an air leak in the first or second stage regulator
3
GAUGES
Inspect rubber gauge cover for dry rot and cuts. Inspect for broken glass. Check
0.1
against a master reference gauge for operational accuracy. Inspect hose for dry rot
and cuts; hose connectors for proper seating and thread damage Insure that gauges
are free of dirt and verdigris.
4
OPERATIONAL CHECK
0.1
Connect the major components and conduct operational check. Be alert for unusual
operation or condition; i.e., air leakage. or improper breathing resistance. Conduct an
air leakage test with ample air supply in the tanks and the manifold valve control in the
"on" position; then submerge the equipment in water and check for air leaks.
5
STORAGE
0.1
Dry the equipment and store in a dry cool well ventilated area.
3-2



Privacy Statement - Press Release - Copyright Information. - Contact Us