Click here to make tpub.com your Home Page

Page Title: Table 2-2. POST DIVE PREVENTIVE MAINTENANCE CHECK AND SERVICES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home



   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
SCUBA TANK FILLING.
Up
TB-5-4220-200-12-1 Open Circuit Scuba System Manual
Next
Chapter 3 OPERATORS MAINTENANCE INSTRUCTIONS



TB 5-4220-200-12-1
Table 2-2. POST DIVE PREVENTIVE MAINTENANCE CHECK AND SERVICES
A-POST DIVE CHECK AND SERVICES
TIME REQUIRED 0.6
Work
Interval
Items to be Inspected
Time
Procedure
and
M/H
Sequence
A
1
TANKS
Turn tank manifold to OFF position. Turn manifold reserve lever to activate (DOWN)
position to warn personnel that the tanks have been used.
REGULATOR
2
0.1
Push in on the purge button and release. If free flow on very little flow occurs, see trou-
bleshooting table 4-3 for instructions. Reduce pressure in the regulator and detach the
1st stage from the manifold.
ALL EQUIPMENT
3
CAUTION
Do not press purge button on the second stage regulator when rinsing
the equipment.
4
CLEAN
0.2
Rinse all equipment with fresh water to remove salt deposits and other foreign materi-
al. Wipe equipment dry with a soft cloth.
OPERATION (CHECK)
5
0.2
Reconnect major components and conduct operational check. Disconnect major com-
ponents.
STORAGE
6
0.1
Store equipment in a dry. cool area Do not hang equipment by rubber components.
2-5/(2-6 blank)



Privacy Statement - Press Release - Copyright Information. - Contact Us