Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 2-7 PREPARATION FOR MOVEMENT.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
POWER PLANT OPERATING PROCEDURES
Up
TM-9-6115-662-13P Power Unit Diesel Engine Driven 1 Ton Trailer Mounted 5 Kw 60 Hz PU-797 Manual
Next
Figure  2-15.  Disconnection  of  Power  Plant.

TM   9-6115-662-13&P 2-7  PREPARATION  FOR  MOVEMENT. 2-7.1 Shut Down Generator Set.  Refer to paragraph 2-5.3.1 and stop both generator sets. 2-7.2  Disconnection  Load  an/or  Paralleling  Cables. Never  attempt  to  connector  disconnect  load  cables  while  the  generator  is running.  Failure  to  observe  this  warning  could  result  in  severe  personal injury or death by electrocution. NOTE Before  connecting  the  load,  determine  voltage  and  frequency  requirements of  the  system  or  device  that  is  being  supplied  with  power.  Refer  to TM 9-6115-644-10 and verify that voltage reconnection board is in proper position for voltage requirements and the frequency select switch is in the proper  position.  If  board  requires  repositioning  notify  next  higher  level  of maintenance. a.  Disconnect  power  cable  W19 from  both  generator  sets. b. Disconnect parallel cables from both units. 2-7.2.1 Power Unit. Refer to TM 9-6115-644-10 for removal of load cables. 2-7-2.2 Power Plant.  Load  may  be  connected  to  the  switch  box  (figure  2-15)  by  either  of  two  methods. One  method  is  to  connect  the  load  cable  to  the  J1  connector  (6).  The  other  method  is  to  connect  load cables to the load terminals (1, 2, 3, 4, and 5). Disconnect the load cable using the appropriate method. Disconnect unit A from unit B as follows: a. Disconnect power cable (12) as follows: (1) Disconnect leads from load terminals (9) and remove from power cable sock (10). (2) Disconnect plug end of power cable (12) from connector J2 (14). b. Disconnect  paralleling  cables  as  follows: (1)  Disconnect  paralleling  cables  (11)  from  paralleling  receptacles  (7)  on  both  generator  sets.  Store paralleling cable with unit B generator set. (2) Disconnect end of cable (13) from J16 (8) on unit B generator set and remove from power cable sock  (10). (3) Disconnect the other end of cable  (13) from  connector  J3  (15) of the switch box located on unit A.  Store  paralleling  cable  with  unit  A  generator  set. 2-45