Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: POWER PLANT OPERATING PROCEDURES
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
2-6.2 PU-804  Identification  Transportation  Data  Plate.
Up
TM-9-6115-662-13P Power Unit Diesel Engine Driven 1 Ton Trailer Mounted 5 Kw 60 Hz PU-797 Manual
Next
2-7  PREPARATION  FOR  MOVEMENT.

TM  9-6115-662-13&P POWER PLANT OPERATING PROCEDURES BEFORE  OPERATION 1.  CHECK/SERVICE  BOTH  GEN  SETS  BEFORE  OPERATION.  CONNECT  "GND"  TERMINAL  TO  GROUND. CONNECT  CONTACTOR  POWER  CABLE. INDICATOR  LIGHTS 1.  STATUS  LIGHT,  INDICATES  LINE  BETWEEN  GEN  AND  SW  BOX  IS  HOT. 2.  ON  LINE  LIGHT,  INDICATES  SWITCH  BOX  CONTACTOR  IS  CLOSED  FOR  INDICATED  GEN. OPERATING   PROCEDURES 1.  START  EITHER  GEN.  ADJUST  VOLTAGE  AND  FREQUENCY. 2. PUT GEN “CKT INTRPT SWITCH” IN “CLOSED” POSITION. (SWITCH BOX “STATUS” LIGHT SHOULD LIGHT.) 3. AT SWITCH BOX, SET “ON-OFF” SWITCH TO “ON”. (“ON LINE” LIGHT SHOULD LIGHT.) LOAD TRANSFER PROCEDURES (SETS CONNECTED FOR PARALLEL OPERATION PER TM) 1. ON  “OPERATING”  GEN,  (GEN  NO.  1)  SET  “UNIT-PARALLEL”  SWITCH  TO  “PARALLEL”. 2.  START  GEN  NO.  2.  ADJUST  VOLTAGE  AND  FREQUENCY  TO  MATCH  GEN  NO.  1. 3. AT SW BOX, SET GEN NO. 2 “ON-OFF” SWITCH TO “ON”. (“ON LINE”  AND “STATUS” LIGHTS SHOULD LIGHT.) 4.  AT  GEN  NO.  2,  SET  “UNIT-PARALLEL”  SWITCH  TO  “PARALLEL”.  BOTH  “SYNCHRONIZING”  LIGHTS  SHOULD BE  GOING  BRIGHT  TO  DARK  TOGETHER. 5.  INCREASE  FREQUENCY  UNTIL  “SYNCHRONIZING”  LIGHTS  BLINK  TOGETHER  ONE  OR  MORE  TIMES  PER  SECOND. 6.  DECREASE  FREQUENCY  UNTIL  LIGHTS  BLINK  TOGETHER  ONCE  EVERY  3-4  SECONDS. 7. WHEN LIGHTS ARE DARK, SET GEN NO. 2 “CKT INTRPT SWITCH” TO “CLOSE”. GEN CONTACTOR LIGHT SHOULD  LIGHT  AND  “SYNCHRONIZING”  LIGHTS  SHOULD  GO  OUT. 8. AT GEN NO. 1, SET “CKT INTRPT SWITCH” TO “OPEN”, SET “UNIT-PARALLEL” SWITCH TO “UNIT”. TURN  “MASTER”  SWITCH  TO  “STOP”.  (AT  SWITCH  BOX,  “ON  LINE”  AND  “STATUS”  LIGHTS  FOR  GEN  NO.  1 SHOULD  GO  OFF.) 9. AT GEN NO. 2, SET “UNIT-PARALLEL” SWITCH TO “UNIT”. Figure 2-14. Power Plant Instruction Plate. 2 - 44