Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: c. On operating generator set
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
2-5.3.3 Removal from  Parallel  Operation
Up
TM-9-6115-662-13P Power Unit Diesel Engine Driven 1 Ton Trailer Mounted 5 Kw 60 Hz PU-797 Manual
Next
Figure 2-9. Load Transfer Operation.

TM  9-6115-662-13&P c. d. e. f. g. h. On operating generator set (generator 1), set UNIT-PARALLEL switch (16, figure 2-9) to PARALLEL. Start generator set 2. Adjust voltage and frequency to match generator set 1. At switch box, set generator set 2 ON-OFF switch (3 or 6) to ON (Switch box STATUS and ON LINE lights for both generator sets should be lit). At generator set 2 control panel: (1) (2) (3) (4) Set  UNIT-PARALLEL  switch  (16)  to  PARALLEL.  Both  SYNCHRONIZING  LIGHTS  (12) should be going bright to dark together. CAUTION If synchronizing lights on generator set 2 do not go bright and dark in unison, the phasing is wrong. Shut down generator sets and check that load  cables  are  connected  properly.  Failure  to  observe  this  caution  can result in damage to generator sets. Increase frequency until SYNCHRONIZING LIGHTS (12) blink together one or more times per second. Decrease frequency until SYNCHRONIZING LIGHTS (12) blink together once every 3-4 seconds. While both synchronizing lights are dark, position and hold AC CIRCUIT INTERRUPTER switch  of  generator  set  2  in-the  CLOSED  position  until  indicator  lights.  SYNCHRONIZING LIGHTS should go out (both generators are now operating in parallel). Once both of the generator sets are on line and supplying power to the load in parallel, perform the following steps to transfer the load. (1) At the control panel of the generator set that is to be taken off line (generator set 1), set the AC  CIRCUIT  INTERRUPTER  switch  to  the  OPEN  position.  Set  UNIT-PARALLEL  switch  to UNIT,  MASTER  SWITCH  to  OFF.  (At  switch  box,  STATUS  and  ON-LINE  lights  for  generator taken off line should go off.) (2) At the control panel of the running generator set (generator set 2), place the UNIT-PARALLEL switch  to  UNIT.  The  load  has  now  been  transferred. Perform the generator PMCS listed as DURING for generator set 2 and AFTER for generator set 1. 2-40