Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 2-5.3.3 Removal from Parallel Operation
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
d. Refer to paragraph 2-5.3.1
Up
TM-9-6115-662-13P Power Unit Diesel Engine Driven 1 Ton Trailer Mounted 5 Kw 60 Hz PU-797 Manual
Next
c. On operating generator set

TM  9-6115-662-13&P l. m. n. o. NOTE If  the  REVERSE  POWER  indicator  on  the  FAULT  INDICATOR  PANEL  of either generator set lights, and the AC circuit interrupter relay opens, open the load contactor at load and resynchronize the generator sets (Repeat the necessary steps d through j above). Compare  AC  AMPERES  meter  (9)  readings  of  both  generator  sets.  If  readings  are  not  within  10 percent, notify next higher level of maintenance. Compare  PERCENT  POWER  meter  (10)  readings  of  both  generator  sets.  If  readings  are  not within 10 percent, notify next higher level of maintenance. Close control panel access cover (7) and secure with clamping Perform the PMCS listed as DURING in table  2-2. catch  (8). 2-5.3.3 Removal from  Parallel  Operation. a. b. c. d. e. f. If necessary to move a generator set which has been operating in parallel with another generator set, shut down remaining generator set connected to the  load,  prior  to  removing  load  and  ground  cables.  Failure  to  observe  this warning can result in injury or death by electrocution. CAUTION Prior to removal of generator set from parallel operation, make sure load does  not  exceed  full  load  rating  of  generator  set  remaining  on  line.  Failure to observe this caution can result in damage to generator set. At the control panel of the generator set that is to be taken off line, position AC CIRCUIT INTER- RUPTER  switch (13) in the OPEN position until indicator (14) goes out. Set UNIT-PARALLEL switch (16) to UNIT. On the switch box place the ON LINE switch  (3 or 6) for  the  operating  generator  set  in  the  OFF position. (At switch box, ON and ON LINE lights for the generator shut down should be off). Rotate MASTER switch to OFF position. At the control panel of the operating generator set, place the UNIT-PARALLEL switch at UNIT. Perform the PMCS listed as AFTER in Table 2-2 for the generator set that was shut down. 2-5.3.4 Load  Transfer  Procedures  (Sets  connected  for parallel  operation). a. One generator set (generator set 1) should already be on line and supplying power to the load, b. For  the  generator  set  not running (generator set 2), perform the PMCS listed as BEFORE in table 2-2. 2-39