Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: d. Refer to paragraph 2-5.3.1
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure  2-8.  Power  Plant  Operation.
Up
TM-9-6115-662-13P Power Unit Diesel Engine Driven 1 Ton Trailer Mounted 5 Kw 60 Hz PU-797 Manual
Next
2-5.3.3 Removal from  Parallel  Operation

TM   9-6115-662-13&P d. Refer to paragraph 2-5.3.1 (steps c. through i.), to start a generator set and bring it on line. e. On operating generator set (generator set 1) position UNIT-PARALLEL switch (16) to PARALLEL. f. Start generator set 2 and adjust voltage and frequency to match generator set 1. g. At switch box, set generator set 2 ON-OFF switch (3 or 6) to ON (Switch box STATUS & ON-LINE lights for both generators should be lit). h. At generator set 2 control panel: (1)  Set  UNIT-PARALLEL  switch  (16)  to  PARALLEL.  Both  SYNCHRONIZING  LIGHTS  (12) should be going bright to dark together. CAUTION If SYNCHRONIZING LIGHTS on generator set 2 do not go bright and dark in unison, the phasing is wrong. Shut down generator sets and check  that  load  cables  are  connected  properly.  Failure  to  observe  this caution can result in damage to generator sets. (2) Increase frequency until SYNCHRONIZING LIGHTS (12) blink together one or more times per second. (3) Decrease frequency until SYNCHRONIZING LIGHTS (12) blink together once every 3-4 seconds. CAUTION Check that load contactor at load is open before attempting to place generators on line. Failure to observe this caution can result in damage to generator sets. (4)  When  both  SYNCHRONIZING  LIGHTS  (12)  are  dark,  position  and  hold  AC  CIRCUIT  INTER- RUPTER switch (13) of generator set 2 in the CLOSED position until indicator light (14) goes out. SYNCHRONIZING LIGHTS (12) should go out (both generators are now operating in parallel with no load). i. Rotate FREQUENCY adjust potentiometer (15) of generator set 1 until percent power meter (10) reads  approximately  “O”. j. Rotate VOLTAGE adjust potentiometer (11) of generator set 1 until AC AMPERES meter (9) reads approximately  “O”. k. Close the load contactor at the load. 2-38

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing