Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 2-5.3.2 Operating Generator Sets in Parallel.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
2-4 INITIAL ADJUSTMENTS, CHECKS, AND SELF TEST.
Up
TM-9-6115-662-13P Power Unit Diesel Engine Driven 1 Ton Trailer Mounted 5 Kw 60 Hz PU-797 Manual
Next
Figure  2-8.  Power  Plant  Operation.

TM 9-6115-662-13&P j. Close  the  control panel access cover (7) and secure with clamping catch (8). k. Perform the PMCS listed as “DURING” in table 2-2. l. To shut down generator set, place  AC CIRCUIT  INTERRUPTER  switch  in  the  OPEN  position. m. On the switch box, place the ON LINE switch  (3 or 6) for the operating generator set in the OFF position. NOTE Before shutting generator set off, allow it to operate five minutes with no load   applied. n. On the generator control panel rotate the MASTER switch to the OFF position. 2-5.3.2   Operating Generator Sets in Parallel.  The  generator  sets  can  be  operated  in  parallel  through the switch box or at the generator set load terminals. When paralleling at the generator set load terminals, refer to paralleling procedures in TM  9-6115-644-10.  When paralleling at the switch box, perform  the  following  procedures: a. b. c. WARNING Prior to making any connections for parallel operation, ensure that there is no input to the load and that the generator sets are shut down. Failure to observe this warning can result in serious injury or death by electrocution. WARNING Never attempt to start the generator set if is not properly grounded. Failure to observe this warning can result in serious injury or death by electrocution. Ensure that load requirement is equal to or below the combined rated capacity of the two generator  sets. Perform the Preventive Maintenance Checks and Services (PMCS) listed as “BEFORE” in table  2-2. Install load and paralleling cables. CAUTION Do  not  close  the  AC  CIRCUIT  INTERRUPTER  switch  (13) on  either  of the generator sets or close the load contactor at load until specifically directed to do so. Closing any of these devices at any other time may severely damage one or both of the generator sets. 2-36