Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 2-4 INITIAL ADJUSTMENTS, CHECKS, AND SELF TEST.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-7. Fuel  Container  Adapter.
Up
TM-9-6115-662-13P Power Unit Diesel Engine Driven 1 Ton Trailer Mounted 5 Kw 60 Hz PU-797 Manual
Next
2-5.3.2   Operating Generator Sets in Parallel.

TM    9-6115-662-13&P i. Insert  fuel  container  adapter  into  external  fuel  source.  Secure  fuel  container  adapter  by  pressing down on strainer clamp (1). 2-4 INITIAL ADJUSTMENTS, CHECKS, AND SELF TEST. Refer to TM 9-6115-644-10 for initial adjustments, checks and self test. 2-5 OPERATING   PROCEDURES. 2-5.1 Generator  Set  Operating  Procedures.  Refer  to  TM  9-6115-644-10  for  generator  set  operating procedures. 2-5.2 Trailer  Operating Procedures.  Refer  to  TM  9-2330-205-14&P  for  trailer  operating  procedures. 2-5.3 Power Plant Switch Box Operating Procedures.  The power plant can be operated either in a single  generator  set  configuration  or  parallel  operation  of  the  generator  sets.  The  following  paragraphs provide operating procedures for a single generator, generators in parallel, or transfer of the load from one generator  to  another. 2-5.3.1   Operating a Single Generator Set. a. b. c. d. e. f. g. h. i. WARNING Do not operate equipment until it is properly grounded, and no load termi- nals  are  shorted.  Failure  to  observe  this  warning  can  result  in  severe personal injury or death. NOTE Before operating generator sets, all connections must be made to the switch box  assembly. Perform the Preventive Maintenance Checks and Services (PMCS) listed as “Before” in table 2-2. Release the clamping catch (8, figure 2-8) and open the control panel access cover (7). To  start  either  generator  set,  rotate  the  MASTER  switch  to  START  position.  Hold  MASTER switch in START position until oil pressure reaches 25 psi (172 k PA), and voltage reaches the appropriate  required  value. Release  MASTER  switch  to  PRIME  AND  RUN  position. Readjust  VOLTAGE  potentiometer  to  required  voltage. Readjust  FREQUENCY  potentiometer  to  required  frequency. Place  AC  CIRCUIT  INTERRUPTER  switch  in  the  closed  position. Check switch box to make sure that ON light (1 or 4) is lit for the generator set just started. At the switch box, set the ON/OFF switch (3 or 6) in the ON position (ON LINE light should light). Generator is now supplying power to the load. 2-35

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing