Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 2-3.4 Connecting Load and/or Paralleling Cables
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-5. Ground Rod, Grounding Strap, and Slide Hammer.
Up
TM-9-6115-662-13P Power Unit Diesel Engine Driven 1 Ton Trailer Mounted 5 Kw 60 Hz PU-797 Manual
Next
Figure  2-6  Connecting  Power  Plant.

TM 9-6115-662-13&P (2) Install washer (2) on ground stud (4). (3) Thread wing nut (1) on the ground stud (4) and tighten. (4) Insert ground cable end into ground cable clamp (5) and tighten clamp screw (6). i. Disassemble slide hammer as follows: (1) Remove nut (6, figure 2-5) from end of rod (4) and retain. (2) Remove hammer (5) from rod (4) and thread nut (6) on end of rod to prevent loss. (3) Store hammer (5) and rod (4) with assembled parts in accessory box. 2-3.4 Connecting  Load  and/or  Paralleling  Cables. WARNING Never attempt to connect or disconnect load cables while the generator set is running. Failure to observe this warning could result in severe personal injury or death by electrocution. NOTE Before connecting the load, determine voltage and frequency requirements of the system or device that is being supplied with power. Refer to TM 9-6115-644-10 and verify that voltage reconnection board is in proper position for voltage requirements and the frequency select switch is in the proper  position.  If  board  requires  repositioning  notify  next  higher  level  of maintenance. 2-3.4.1  Power Unit.  Refer  to  TM  9-6115-644-10  for  installation  of  load  cables. 2-3.4.2  Power Plant.  Load  may  be  connected  to  the  switch  box  (figure  2-6)  by  either  of  two  methods. One method is to connect the load cable to the J1 connector (6, figure 2-6). The other method is to connect load cables to the load terminals (1,2,3,4, and 5,figure 2-6). Connect unit A to unit B as follows: NOTE A  paralleling  cable  is  furnished  with  each  generator  set.  Cables  are  located in a storage box inside battery access doors. a. Connect paralleling cables as follows: (1) (2) (3) Connect one end of cable (13) to connector J3 (15) of the switch box located on unit A. Route the other end of cable (13) through power cable sock (10) and connect to connector J16 (8) on Unit B generator set. Connect the other paralleling cable (11) between the two paralleling receptacles (7) located on the generator set control panels. 2-32

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing