Back Operator Preventive Maintenance Checks and Services for AN/MJQ-40, PU-803, and PU-804 - continued | Up TM-9-6115-662-13P Power Unit Diesel Engine Driven 1 Ton Trailer Mounted 5 Kw 60 Hz PU-797 Manual | Next Operator Preventive Maintenance Checks and Services for AN/MJQ-40, PU-803, and PU-804 - continued |
TM 9-6115-662-13&P
Item
No.
29
30
Interval
Before
Before
Table 2-2. Operator Preventive Maintenance Checks and Services
for AN/MJQ-40, PU-803, and PU-804 (continued)
Location
Item to Check/Service
GENERATOR SET -
continued
CONTROLS AND
INDICATORS
CONTROL BOX HARNESS
Not Fully Mission
Procedure
Capable if:
a.
b.
c.
Check indicators and controls
Indicators or controls
for damage or missing parts.
damaged or missing.
Place PRIME RUN switch to
AUX PRIME RUN and press
TEST RESET LAMPS button
on fault indicator. All test
lamps must light.
Check fuel gauge for fuel
indication.
Check inside control box for loose
Loose or damaged
or damaged wiring.
wires.
2-22
|