Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Section III. MAINTENANCE PROCEDURES
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 3-5. SYNCHRONIZING lndicator Lamps Fail To Operate ln Unison When Transfer Switch Is Operated
Up
TM-9-6115-660-13P Power Plant Diesel Engine Driven 1-Ton Trailer Mounted (With Racks) 3Kw 60 Hz AN/MJQ-42 Manual
Next
CHAPTER 4 UNIT MAINTENANCE

Section  III.  MAINTENANCE 3-3  Operator  Maintenance. TM  9-6115-660-13&P PROCEDURES 3-3.1 Generator Set.  Refer  to  TM  9-6115-642-10. 3-3.2 Power Plant.  The  maintenance  functions  that  the  Maintenance  Allocation  Chart  authorizes  the operator to perform are the preventive maintenance checks and services listed in table 2-2 and the replacement  of  indicator  lamps  located  on  the  switch  box.  Perform  the  following  steps  to  replace  ON,  ON- LINE,  and  SYNCHRONIZING  indicator  lamps: a. b. Unscrew lens from lamp housing and remove lamp from lens (ON and ON-LINE lamps) or housing (SYNCHRONIZING lamps). Install new lamp in housing or lens and screw lens on housing. 3-9/(3-10  Blank)

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing