Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 2-7 PREPARATION FOR MOVEMENT.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-14.3.  PU-798A and PU-799A Trailer Chassis Identification Plate.
Up
TM-9-6115-660-13P Power Plant Diesel Engine Driven 1-Ton Trailer Mounted (With Racks) 3Kw 60 Hz AN/MJQ-42 Manual
Next
d. Remove slide hammer components

TM  9-6115-660-13&P 2-7  PREPARATION  FOR  MOVEMENT. 2-7.1 Shut Down Power Plant/Power Unit.  If  power  plant/power  unit  is  operating,  stop  generator  set as follows: 2-7.1.1 Power  Plant.  Refer to paragraph 2-5.3.3. 2-7.1.2 Power  Unit. 2-7.2 a. Stop the generator set in accordance with TM 9-6115-642-10. b. Perform the generator set PMCS listed as “After” in table 2-2. Disconnect Load Cables. WARNING a. b. c. 2-7.3 Make sure generator sets are shut down before connecting load cables. Failure to observe this warning can cause severe personal injury or death. For Power Unit configuration, refer to TM 9-6115-642-10 and disconnect load cables. For Power Plant configuration where load cable is connected to switch box output connector, perform the following. (1) Disconnect  load  cable  from  switch  box  output  connector  (6,  figure  2-8). (2)  Install  cap  (5)  on  output  connector  (6). (3)  Store  load  cable  with  equipment  that  was  being  supplied  with  electric  power. For Power Plant configuration where load cables are connected to switch box load terminals, perform  the  following: (1) (2) (3) (4) Release both clamping catches (4) and raise load terminal cover (2). Using load terminal box wrench, loosen terminal nuts (1). Disconnect load cables from switch box load terminals (3). Store load cables with equipment that was being supplied with electric power. Retrieve Ground Cable and Rod. a. b. c. Remove wing nut (1, figure 2-7) and flat washer (2). Remove ground cable (3) from ground stud (4). Reinstall flat washer and wing nut on ground stud. Loosen clamp (9, figure 2-6) and remove ground cable (8) from clamp. Store ground cable in accessory box. 2-41