Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 2-6.5 Power Plant Instruction Plate
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-12.  PU-798 Identification/Transportation Data Plate.
Up
TM-9-6115-660-13P Power Plant Diesel Engine Driven 1-Ton Trailer Mounted (With Racks) 3Kw 60 Hz AN/MJQ-42 Manual
Next
Figure 2-14.  1.  PU-798A Shipping Data/identification Plate.

TM 9-6115-660-13&P 2-6.5  Power  Plant  Instruction  Plate.    Refer  to  figure  2-14.    This  plate  covers  operating  procedures  for  power  plants AN/MJQ-37 and AN/MJQ-38.  It is located on the top of the switch box load terminal cover. 2-6.6  PU-798A  Shipping  Data/Identification  Plate.    Refer  to  figure  2-14.1.    This  plate  is  located  on  front  of  curbside fender. 2-6.7  PU-799A  Shipping  Data/Identification  Plate.    Refer  to  figure  2-14.2.    This  plate  is  located  on  front  of  curbside fender. 2-6.8  PU-798A  and  PU-799A  Trailer  Chassis  Identification  Plate.    Refer  to  figure  2-14.3.    This  plate  is  located  on curbside tow bar. POWER PLANT OPERATING PROCEDURES BEFORE OPERATION 1. CHECK/SERVICE  BOTH  GEN  SETS  BEFORE  OPERATING.    CONNECT "GND" TERMINAL TO GROUND. OPERATING PROCEDURES 1. START EITHER GEN SET.  ADJUST VOLTAGE AND FREQUENCY. PUT "CKT BKR" SWITCH IN "CLOSED" POSITION. 2. SWITCH  BOX  "GEN  SET"  LIGHT  SHOULD  LIGHT.    IF  NOT,  REFER  TO TM. 3. AT SWITCH BOX, PLACE "ON-OFF SWITCH TO "ON". "ON LINE" LIGHT SHOULD LIGHT.  IF NOT, REFER TO TM. LOAD TRANSFER PROCEDURES, ONE SET OPERATING AS ABOVE. 1. START SECOND SET, ADJUST VOLTAGE AND FREQUENCY TO MATCH OPERATING SET. 2. ON SECOND SET, PLACE "CKT BKR" SWITCH IN THE ’CLOSED" POSITION. 3. AT SWITCH BOX, "GEN SET" LIGHT FOR SECOND SET  SHOULD  LIGHT.    IF  NOT  REFER  TO TM. 4. AT  SWITCH  BOX,  PLACE  TRANSFER’  SWITCH  TO  ’TRANSFER’.    BOTH  "SYNCHRONIZING" LIGHTS SHOULD BE GOING FROM BRIGHT TO DARK TOGETHER. 5. ON    SECOND    SET,    INCREASE    FREQUENCY    UNTIL    ’SYNCHRONIZING’    LIGHTS    BLINK TOGETHER  ONE  OR  MORE  TIMES  PER  SECOND.    THEN  DECREASE  FREQUENCY  UNTIL LIGHTS BLINK TOGETHER ONCE EVERY 34 SECONDS. 6. AT SWITCH BOX, WHEN BOTH LIGHTS ARE DARK, PLACE ’ON-OFF" SWITCH FOR SECOND SET TO "ON". 7. ’ON  LINE’  LIGHT   FOR   SECOND   SET   SHOULD   LIGHT,   ’ON-LINE’   LIGHT   FOR   OTHER   SET SHOULD   GO   OFF.   (SECOND   SET   IS   NOW   SUPPLYING   POWER   AND   "SYNCHRONIZING" LIGHTS SHOULD BE DARK). 8. AT  FIRST  SET,  PLACE  ’CKT  BKR’  SWITCH  TO  THE  "OPEN’  POSITION  AND  SHUT  THE  SET DOWN. Figure 2-14.  Power Plant Instruction Plate. 2-40  Change 2

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing